HOME2024-01-16T11:27:43+03:00

News and Events

REGIONAL CENTRAL CORRIDOR STAKEHOLDERS’ CONSULTATIVE COMMITTEE (STACON) MEETING IN DAR ES SALAAM, TANZANIA

The Central Corridor Stakeholders Consultative Committee (STACON) Meeting took place from April 16th to 17th, 2024, at the JOHARI ROTANA Hotel in Dar [...]

April 19th, 2024|
Adv. OKANDJU OKONGE Flory
Adv. OKANDJU OKONGE FloryExecutive Secretary
VIEW OUR ROUTES

VACANCIES

TENDER

Central Corridor Transport Observatory Reports

DOWNLOAD REPORTS

Our Projects

View in All
  • Kalundu Port-Uvira-Kamanyola-Bukavu Road; Lot 1
    Kalundu Port-Uvira-Kamanyola-Bukavu Road; Lot 1
    Projects
  • Uvinza – Musongati -Gitega -DRC Railway
    Uvinza – Musongati -Gitega -DRC Railway
    Projects
  • Dar es Salaam – Isaka – Kigali Railway
    Dar es Salaam – Isaka – Kigali Railway
    Projects
Kalundu Port-Uvira-Kamanyola-Bukavu Road; Lot 1

Project Description: Covers 50KMs and its construction will reduce transport costs and time along the Central Corridor.
Estimated Cost: USD 100 thousand
Status: Fact finding mission to be carried out.

Categories :
Projects
Uvinza – Musongati -Gitega -DRC Railway

Project Description: A railway project covering 3 countries of Burundi, DRC and Tanzania.
Estimated Cost: USD 180 thousand
Status: Feasibility study for the Uvinza-Musongati is done. Routes identification missions have been conducted by the 3 countries. Awaiting feasibility study on the remaining part of the route.

Categories :
Projects
Dar es Salaam – Isaka – Kigali Railway

Project Description: A railway project covering 2 countries of Rwanda and Tanzania.
Estimated Cost: USD 120 thousand
Status: Joint Technical Steering Committee meetings facilitated.

Categories :
Projects

[fts_twitter twitter_name=@ccttfaorg tweets_count=6 cover_photo=yes stats_bar=no show_retweets=yes show_replies=no]

Go to Top