News and Events
CCTTFA DRC STAKEHOLDERS HOLD MEETING TO REVIEW FINAL REPORT FOR THE KALUNDU-LUBERIZI RAOD PROJECT
CCTTFA stakeholders in DRC from the Ministry of Waterways and Ministry of Infrastructure held a meeting in Kinshasa to validate the final report of th [...]
TANZANIA ISSUES NEW TRAVEL ADVISORY ON COVID-19 SITUATION
The Government of the United Republic of Tanzania has been instituting various preventive measures with the goal of limiting the spread of the Corona [...]
Our Projects
Project Description: Covers 50KMs and its construction will reduce transport costs and time along the Central Corridor.
Estimated Cost: USD 100 thousand
Status: Fact finding mission to be carried out.
Categories : |
Projects
|
---|
Project Description: A railway project covering 3 countries of Burundi, DRC and Tanzania.
Estimated Cost: USD 180 thousand
Status: Feasibility study for the Uvinza-Musongati is done. Routes identification missions have been conducted by the 3 countries. Awaiting feasibility study on the remaining part of the route.
Categories : |
Projects
|
---|