News and Events
CCTTFA held Stakeholders Consultative meeting (STACON) in Burundi, Uganda, Rwanda and DR Congo
Last week CCTTFA held a Stakeholders Consultative meeting (STACON) in Burundi, Democratic Republic of Congo, Rwanda and Uganda to discuss and delibera [...]
BURUNDI AND DRC SIGN CONTRACT FOR A FEASIBILITY STUDY FOR THE ELECTRIFIED STANDARD GAUGE RAILWAY PROJECT (GITEGA-BUJUMBURA-UVIRA-KINDU)
On 31st March 2023 Burundi and Democratic Republic of Congo (DRC) signed the contract for the Feasibility Study and Preliminary Engineering Design of [...]
Our Projects
Project Description: Covers 50KMs and its construction will reduce transport costs and time along the Central Corridor.
Estimated Cost: USD 100 thousand
Status: Fact finding mission to be carried out.
Categories : |
Projects
|
---|
Project Description: A railway project covering 3 countries of Burundi, DRC and Tanzania.
Estimated Cost: USD 180 thousand
Status: Feasibility study for the Uvinza-Musongati is done. Routes identification missions have been conducted by the 3 countries. Awaiting feasibility study on the remaining part of the route.
Categories : |
Projects
|
---|